美术水果派对教案
Home > Product > Pipe Fitting Mould > PE Pipe Fitting Mould

Contact Us

Add:No.168, Kangqiang Road, North Industrial Area, Huangyan, Taizhou, Zhejiang, China

Mob:+8613738590737

Tel:+86-576-84019859

Fax:+86-576-84019959

E-mail:[email protected]

Latin American Continent: (English / Spanish / Portuguese)

Email: [email protected]

Cel: +1 786 2205799

PE Butt Fusion Elbow 45 Pipe Fitting Mould

PE butt fusion elbow 45 pipe fitting mould Product Description Packaging & Shipping After assemble and clear mould, we paint anti-rust grease on mould, then cover it with thin film and place it into a stable wooden box. STEP for Plastic PE Fitting Mould :
Chat Now

Product Details

PE butt fusion elbow 45 pipe fitting mould

image001(001).jpg


Product Description

Mould Name

PE butt fusion elbow 45 pipe fitting mould

Demould Type

Auto-matically Ejection

Mould Base

LKM & Hasco & DME or equivalant quality as above mentioned or not standard as you need

Mould steel

45#, P20, H13,718, 2738, 2316 Chinese, 1.2316, S136, SKD61,NAK80 etc.

Mould Cavity

Singe or multi as your requirement

Runner&gate

Cold runner ,Hot runner,YUDO runner ,Pin -point gate,Submarine gate,etc

Design Software

UG,PROE,CAD,etc

Part Material

PVC, PPR, PP, PC, PS, PE, PA, ABS, TPE, UPVC, CPVC, HDPE, PPSU, ABS, Rubber, Nylon, etc

Surface Treatment

Usually heat treatment & Nitriding or quenching w.good polishing, or texturing, etc as customers' requirement

Machine

CNCs, Lathe,Milling Machine,Grinding Machine,Drilling Machine, NC-EDM,NC Wire Cutting, Carving Machine,etc

Packaging

Wooden boxes

Trade term

Usually Fob ningbo or shanghai port

Payment Terms

T/T , L/C at sight


Packaging & Shipping

After assemble and clear mould, we paint anti-rust grease on mould, then cover it with thin film and place it into a stable wooden box.

image003.jpg

STEP for Plastic PE Fitting Mould :

1. Received inquiry

By email, Online Talking, or telephone call.

2. Quote within 24 hours

Send you quotation sheet with all details information

2. Negotiation

About quality, price, delivery time, payment, shipment ect.

3. Design

According to your own design or you chooses our design.

4. Drawing

Customer confirm the final drawing.

5. Mould

According to customers request to build the mould. Before make the mould, we send mould design to customer approval first, before move forward to production; we send samples to customer to confirm first.

6. Sample shoot

If the 1st sample is not satisfied cusmter, we modify the mould until meet customer’s satisfactory.

7.Products in store

If your quantity is beyond our storage, we will provide lead time to you.

8. Delivery

By Sea or by Air. According to customer’s requests.


Hot Tags: PE butt fusion elbow 45 pipe fitting mould, China, manufacturers, factory, Huangyan
Related Products

Feedback

美术水果派对教案 华煦期货配资 竞彩足球比分计算器 日本av渡濑晶 中园竞彩网篮球比分直播 20选5 即时赔率欧亚盘口 广西快乐双彩开奖公布 北京麻将怎么打 山东十一选五开奖一 电竞比分007 3d免费预测最新最准 今日竞彩比分推荐专栏 3d开奖结果双色球 2019股票配资平台官方排名 乐透棋牌官方网址 客户理财平台